You are in Home - News

ARCOIN SL

News

Opening of VIP room

Opening of VIP room

Aena inaugurated the new opening of its lounge VIP at the airport in Lanzarote, after a profound renovation, carried out by Arcoin S.L

New contract for Caja Siete

New contract for Caja Siete

Once again our client, trust Arcoin SL for the implementation of a new banking office in the town of Tuineje Fuerteventura

Aena awarded us a new work

Aena awarded us a new work

At the airport in Lanzarote, Aena adjudge us a record with a duration of 6 months of implementation to implement new and new works and local surfaces.

The Technology Park of Fuerteventura host SALT 2014

The Technology Park of Fuerteventura host SALT 2014

Fuerteventura host the V edition of the Atlantic Hall of Logistics and Transport SALT 2014, that as of November 19 will be held in the facilities of the Technological Park of Fuerteventura. The president of the Cabildo of Fuerteventura, Mario Cabrera, met yesterday with the director general of Transport of the Government of the Canary Islands, Rosa Davila, to advance preparations for this international meeting of transportation. The meeting included a visit to the bioclimatic building of the Technology Park, alongside the technical team of SALT. Also attended by the Minister for Transport, Natalia Évora, and the Minister for Economic Development, Manuel Miranda.

The Salon is organized by the Cluster Canario Transport and with the collaboration of the Canary Islands Government, through the program of actions to enhance the connectivity between the islands and southern Morocco, which in turn is part of the Operational Programme of Cooperation External Borders-Spain border.

Rosa Davila explained that the connectivity to Africa, especially through Tarfaya, will be one of the central themes of this edition of SALT. Also said that "a number of African countries have confirmed the presence of delegations, but have also shown interest in participating delegations from other countries such as Germany, Turkey and Bulgaria, who value opportunities Canary Africa as a business platform."

For his part, President of the Cabildo, Mario Cabrera, said that "by holding Africagua by the Chamber of Commerce and is specifically focused on clean energy and water desalination, Fuerteventura SALT become an essential meeting place and institutional business with African countries

III ORLA ANTS INFANT SCHOOL

III ORLA ANTS INFANT SCHOOL

Today we have celebrated the delivery of the Orla for our dear children of 3 years old in the school which manages Arcoin.

We have also taken so that parents of all children would see the different activities carried out in our school.

Our children have been a performance for watching as well that they spend it and more than one has escaped us a tear of laughter.

From the direction of Arcoin congratulations for the excellent work done by the team that leads this project

Work begins conditioning Square Agua de Bueyes

 Work begins conditioning Square Agua de Bueyes

The initiative is being implemented by the company Arcoin and has a deadline of five months

Former City Council invests 148,000 euros in this public space

Us Architecture, Construction and Engineering (ARCOIN, SL) has recently begun the refurbishment of the Square Agua de Bueyes, an initiative by the city of Antigua and included within the improvement of the free and public spaces of the town. The works, which have an investment of 148,055 euros, will be in a period of five months.

The works will include the partial demolition and removal of existing pavement in the square, to be coated with natural stone, porphyry, lip or irregular tile type, improving the environment of the shrine of Our Lady of Guadalupe, classified as a Site of Interest Cultural (BIC), and ennobling their appearance.

Other actions include the removal of low plants and the demolition of the walls near the boundary of the plot that connects with the upper street, achieving expand the usable space of the square parterres. To this the adaptation and extension of the existing ramp is attached to facilitate the entry of vehicles into the square (cleaning vehicles, emergency, etc..).

The project also includes the construction of ramps and access to natural stone, demolition and new implementation of the stairs to the plaza and the remodeling and adaptation of the staircase that connects with the public school.

In addition, pipelines for preinstallation different connections, both electrical and water irrigation network in gardens, sewer connection and disposal of stormwater run. Similarly, replacing intervene in existing fixtures.

Renewal of Certificate of Quality Management

Renewal of Certificate of Quality Management

The audit conducted by AENOR renews the Company Registration Certificate No. ER-0821/2008 for an additional period of three years, which demonstrates the conformity of its system of quality management according to the UNE-EN ISO 9001 : 2008

Begin the works of the public square of Valles de Ortega

Begin the works of the public square of Valles de Ortega

The initiative, promoted by works and services, is being executed by the company Arcoin and is for a term of six months

Enterprise architecture, construction and engineering (ARCOIN, SL) has recently begun the development works of the square of Valles de Ortega, an initiative by the Department of works and services of the city of Antigua and included within the improvement of free and public spaces of the municipality. Works, which have an investment of 130.888,49 euros, will be carried out over a period of six months. 

The refurbishment of the square of Valles de Ortega includes a series of artworks before, such as earthworks, vegetation removal, demolition of factory items and dismantled planters, among others. Many of them are being made these days, so this public space in this town of the municipality has already has fencing. 

The performance will involve the construction of new platform, which will be held the repaving of the plaza de 390,94 square meters, as well as creating new adapted access and the realization of new planters with paving stones of granite, plant and land picon, transplanting the palms (Washingtonia robusta) range. It will be also placed a stone cladding on the facade of the cultural centre, including the back of the stage and the facades of the toilets.

The project contains also carry out all the necessary work for the creation of the network of lighting public, with the corresponding implementation of trenching, manholes, pipes and wiring, as well as the placement of light fixtures. To this are added irrigation facilities, pre-installing a new rush of plumbing to the cultural centre, the renovation of toilets and the evacuation of rainwater. 

Similarly, the pre-installation of the telecommunications network that runs under the pavement on the section facing the square, will take place which will allow the full network installation underground in the future, without running any work or modification. Also moved the existing telephone booth from the sidewalk to the square, with all operations required to make it fully operational, at the time that will be the basis for the temporary placement of tents and poles.

The first Deputy Mayor and Councillor delegate of works and services, David Alberto, said that this action "will improve other public spaces which is impaired and that has not been object of a reform for many years, as well as the refurbishment of the square of Casillas de Morales, which began four months ago".

Alberto highlighted the need to reform the square of Valles de Ortega, "both by the social importance that have this space public for residents and the attraction to visitors who come to the village". In this sense, he pointed out, "Although this summer parties may not be held in the same location, at the beginning of next year there will be a remodeled, modern and square suitable for festive and cultural events given the demand of citizens".

Award of new office

Award of new office

Our client seven box remains confident in Arcoin for its expansion in the province of Las Palmas with a new award of the conditioning of an office in Las Palmas de Gran Canaria

Antigua City Council awarded us the work conditioning Square Agua de Bueyes

Antigua City Council awarded us the work conditioning Square Agua de Bueyes

Antigua City Council awarded us the work conditioning Square Agua de Bueyes